Categories 2018 Article BSA designs Dosimetry Physics Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target Post author By ISNCT Post date January 1, 2018 No Comments on Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target Journal of Theoretical and Applied Physics, 2018 Tags Fantidis J.G., Journal of Theoretical and Applied Physics