Categories
2020 Article BSA designs ICNCT18 Physics Reactors Special Issue(ARI)

BNCT research facility at MARIA reactor – Numerical models and preliminary measurements

Applied Radiation and Isotopes, 2020

Categories
2020 Accelerators Article BSA designs ICNCT18 Physics Special Issue(ARI)

The E LiBANS project: Thermal and epithermal neutron sources based on a medical Linac

Applied Radiation and Isotopes, 2020

Categories
2000 Article BSA designs Dosimetry Physics

A Monte Carlo dosimetry?based evaluation of the reaction near threshold for accelerator boron neutron capture therapy

Medical Physics, 2000

Categories
2020 Article BSA designs Dosimetry Physics

Design and construction of an accelerator-based boron neutron capture therapy (AB-BNCT) facility with multiple treatment rooms at the Southern Tohoku BNCT Research Center

Applied Radiation and Isotopes, 2020

Categories
2020 Article BSA designs ICNCT18 Physics Special Issue(ARI)

A simulation study on beam property of 124Sb-Be isotope-based neutron for BNCT

Applied Radiation and Isotopes, 2020

Categories
2020 Article Beams BSA designs ICNCT18 Physics Reactors Special Issue(ARI)

Feasibility study of using IRT-T research reactor for BNCT applications

Applied Radiation and Isotopes, 2020

Categories
2019 Article BSA designs Dosimetry Physics

Design and optimization of two-sided beam based on 7Li(p,n)7Be source using in (BNCT) for brain and liver tumors

Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2019

Categories
2018 Article BSA designs Dosimetry Physics

Optimization of Beam Shaping Assembly design for Boron Neutron Capture Therapy based on a transportable proton accelerator

Alexandria Engineering Journal, 2018

Categories
2018 Article BSA designs Dosimetry Physics

Beam shaping assembly design of 7Li(p,n)7Be neutron source for boron neutron capture therapy of deep-seated tumor

Applied Radiation and Isotopes, 2018

Categories
2018 Article BSA designs Dosimetry Physics

Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target

Journal of Theoretical and Applied Physics, 2018