Categories
2020 Article BSA designs Dosimetry Physics

Design and construction of an accelerator-based boron neutron capture therapy (AB-BNCT) facility with multiple treatment rooms at the Southern Tohoku BNCT Research Center

Applied Radiation and Isotopes, 2020

Categories
2020 Article BSA designs ICNCT18 Physics Special Issue(ARI)

A simulation study on beam property of 124Sb-Be isotope-based neutron for BNCT

Applied Radiation and Isotopes, 2020

Categories
2020 Article Beams BSA designs ICNCT18 Physics Reactors Special Issue(ARI)

Feasibility study of using IRT-T research reactor for BNCT applications

Applied Radiation and Isotopes, 2020

Categories
2020 Article BSA designs ICNCT18 Physics Reactors Special Issue(ARI)

BNCT research facility at MARIA reactor – Numerical models and preliminary measurements

Applied Radiation and Isotopes, 2020

Categories
2020 Accelerators Article BSA designs ICNCT18 Physics Special Issue(ARI)

The E LiBANS project: Thermal and epithermal neutron sources based on a medical Linac

Applied Radiation and Isotopes, 2020

Categories
2000 Article BSA designs Dosimetry Physics

A Monte Carlo dosimetry?based evaluation of the reaction near threshold for accelerator boron neutron capture therapy

Medical Physics, 2000

Categories
2019 Article BSA designs Dosimetry Physics

Design and optimization of two-sided beam based on 7Li(p,n)7Be source using in (BNCT) for brain and liver tumors

Nuclear Instruments and Methods in Physics Research Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, 2019

Categories
2018 Article BSA designs Dosimetry Physics

Optimization of Beam Shaping Assembly design for Boron Neutron Capture Therapy based on a transportable proton accelerator

Alexandria Engineering Journal, 2018

Categories
2018 Article BSA designs Dosimetry Physics

Beam shaping assembly design of 7Li(p,n)7Be neutron source for boron neutron capture therapy of deep-seated tumor

Applied Radiation and Isotopes, 2018

Categories
2018 Article BSA designs Dosimetry Physics

Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target

Journal of Theoretical and Applied Physics, 2018